CSO 028 Project
Study Phase
Egis provided a Basis of Design Report outlining all alternatives for the study phase of the CSO 028 project and helped MSD agree to a final design scope. The project scope expanded to include additional on-call services, including:
- Additional WWTP system investigations
- Cowan High School lift station study
- Bethel Avenue dance academy collection system expansion design
- Whitely flood study
- Morrison Bethel lift station study
- Tillotson Avenue force main relocation
- Whitely water quality study
- Burlington road sewer study
- MSD headquarters building renovation
- U-Haul building improvements
- Martin Luther King Jr. Boulevard sanitation building
- Additional Services: Survey, right-of-way engineering and acquisition, sewer system appraisal, utility coordination, map/exhibit creation, long-term control plan management for coordination and combined sewer overflow operations plan update
Design and construction phase
The Egis team provided design services for a 230-acre sewer separation project. The project included a network of new dedicated sanitary sewers, new sewer lateral connections to hundreds of homes and businesses, and a new storm sewer system, including a pond and pump station in an area frequently subjected to flooding during rain events. The pond area has helped to eliminate several vacant properties and add value to the surrounding neighborhood. The original contract scope included only the design of CSO 028; however, MSD’s trust in the Egis team led to the design of several additional design projects:
- White River siphon repair
- Cowan residential sewer
- Whitely stilling basin
- South burlington sanitary sewer
- Elgin and McGalliard stormwater pond
- CSO 027 design
- South Hoyt sewer system
- Additional services: Survey, right-of-way, public outreach and town hall meetings